S.M. Johnson: production schedules - in VBA
Amongst mathematical
algorithms taught to business students one was devised by S.M. Johnson back in 1954. The
issue is having two different operations undertaken on products, in succession.
A range of products at hand has different lapses of time, for both operations.
The goal is to arrange such a schedule, which will minimize the cumulative
production time. This program was needed by the Chair of Business Mathematics.

